The image shows the Neelum-Jhelum Hydropower Project. — APP/FileTunnel failure inquiry continues amid repair work.Cheap hydropower missing from national grid.Draft dam safety bill has been finalised.ISLAMABAD: Pakistan’s nearly $5 billion Neelum-Jhelum Hydropower Project will…
Related Posts
Fitch maintains Pakistan at ‘B-‘ under revised sovereign criteria

The offices of Fitch Ratings building in London, Britain, May 27, 2020. — ReutersFitch affirms Pakistan’s long-term instruments at ‘B-‘.Agency assigns ‘RR4’ recovery rating and removes UCO.Debt trajectory and external liquidity pressures remain key risks.<p…
</p…
Oil prices mixed as WSJ reports IEA proposed largest release of oil reserves in its history

An oil tanker train moves near a railway station on the outskirts of Ahmedabad, India, August 27, 2025. — Reuters
France to host G7 leaders call todayAmerican crude oil, gasoline, and distillate stocks fell.Brent futures trade up 11 cents, or 0.13% higher, at…
Crude oil surges past $108 per barrel as Gulf disruption fears outweigh diplomatic signals
Oil platforms and pumpjacks at Lake Maracaibo, in Cabimas, Venezuela, January 26, 2026. — ReutersOil rises on continued Mideast supply disruption fears.Brent up 2.75% at $108.23; WTI up 2.09% at $96.37.Shipping through Strait of Hormuz remains constrained.
Oil prices…




